sts41 - instrukcja.pdf

(533 KB) Pobierz
Assembly Instructions for STS-41D payload
© 2007
Assembly Instructions for STS-41D payload
(Discovery’s Maiden Flight)
312569656.010.png 312569656.011.png
Building OAST-1 payload
First build the main structure,
the triangular structure with the
numbered areas. Boxes 1, 2 and
3 go in their respective places.
cylinder
312569656.012.png 312569656.013.png
This part will cover the hole of
the cylinder. Do not glue
because is a removable piece to
replace the solar panel.
Solar panel is also inserted here.
Rolled part
Cylinder is
glued to box
312569656.001.png 312569656.002.png 312569656.003.png
 
*
The parts indicated are
glued to the gray areas in
the main triangular box.
For better results glue this
whole part to extra
cardboard to make it
sturdier. The circular
element which is the
grapple fixture is glued to
the gray little bar. *
Building the Solar Array
Truss
The Solar Array has 3 elements, 2 are the solar array faces and the third
element is the truss that is glued in the middle of one face. The truss is the
tall and thin element is the photo above.
312569656.004.png 312569656.005.png
These are both ends of the Solar Array. The left end shows the
“rolled” piece of cardboard that will fit inside the cylinder. Note the
other end.
Building the Syncom-IV satellite
This step is simple and very
straightforward. Make a
cylinder with these 2 parts
and use the circular covers
in sheet 2 to make the
satellite.
Add the engine
nozzle to the
bottom.
312569656.006.png 312569656.007.png 312569656.008.png 312569656.009.png
Zgłoś jeśli naruszono regulamin