Microsoft PowerPoint - Tesla Turbine Operation Sheets.ppt [Compatibility Mode]
MEC1000
Tesla Turbine Operation Sheets
4/25/2008
David Anderson
David Anderson
126651890.016.png
Cover, Housing – 2 axis CNC Mill
Operation 1 –5 min
1.
Cut a piece of 5x5 stock from 3/8 thick Lexan.
Op1
2. Do not bother squaring the edges.
3. Setup in mill and circ‐interp the center hole. Be sure it 
fits the machining fixture before you take your part out 
of the machine.
Operation 2 ‐45min
p
1. Mount in machining fixture.
2.
Set the datum to be center of fixture. Clamp the cover 
as shown.
the  contour  canned cycle, you can add a finish pass to 
the profile as a built‐in step.
4. Drill and counter bore the fastener holes.
Operation 3 –20 min
1. Using 4 fasteners bolt the cover to the fixture.
2. Remove the large clamp washer
3. Drill and tap the small threaded holes.
Program and machine the outer profile. Hint: if you use 
the “contour” canned cycle you can add a finish pass to
Op2
Op3
3.
126651890.017.png 126651890.018.png 126651890.019.png
Shaft, Rotor ‐ Lathe
1. Cut stock  3.6  long from 416 ½ hard SS
2. Hold in 3‐jaw chuck
3. Rough red area . RPM=470, F=.010, DOC=.050
4. Finish red area. RPM=860, F=.005, DOC=.005
Operation 2 –50 min
Cut stock 36” long from 416 ½ hard SS
Op1
1. Hold in collet.
2.
Rough red area(use same settings as rough above).
3.
Finish red area (use same settings as rough above).
4.
Thread end using die and die holder.
Hints:
The minimum DOC (depth of cut) should be greater 
than .005” when cutting SS. Do not attempt to 
creep up on the final diameter by removing tiny 
t thi ill t i t d ild O2
cuts as this will cause taper in your part and yield a 
poor surface finish.
Op2
Cut these dry, thus NO cutting fluid. Make sure you 
use the TiN  coated carbide inserts only. 
Let the part cool to room temp before making final 
t!
cut!
Measure many times, final cut once!
Operation 1 ‐ 40min
1
126651890.001.png
Turbine Housing –2 axis CNC Mill
Operations. 
1.
Cut aluminum stock 2.5”x 5” x 5.4”. Setup in mill and face top surface 
removing only enough material to clean up the top surface, about .020”.
2.
CNC pedestal mill outside profile. Be careful not to machine into jaws!
1.
Rough cut settings: 3 flute  ¾” HSS roughing end mill. F=10 ipm, DOC=.400, S=2400 rpm. 
2.
Finish settings: 2 flute ¾” HSS end mill F=10 ipm, DOC= full height, S=2400 rpm. 
3.
CNC mill large circular pocket 
1.
Rough cut settings: 3 flute  ¾” HSS roughing end mill. F=10 ipm, DOC=.400, S=2400 rpm. 
2.
Finish settings: 2 flute ¾” HSS end mill F=10 ipm, DOC= full height, S=2400 rpm. 
4. CNC mill small circular pocket 
1. Rough cut settings: 2 flute ¾”HSS end mill. F=10 ipm, DOC=thru S=2400 rpm. 
2. Finish settings: 2 flute ¾” HSS end mill F=10 ipm, DOC= thru, S=2400 rpm. 
5. CNC mill o‐ring groove
1. Rough cut settings: 2 Flute  3/32” carbide  end mill. F=5 ipm, DOC=full, S=3000 rpm
2. Rough cut settings: 2 Flute 3/32 ” carbide  end mill. F=5 ipm, DOC=full, S=3000 rpm
6 Drill n tap 10 24 threaded holes
CNC mill small circular pocket
6. Drill n tap 10‐24 threaded holes
7. Flip over and machine off pedestal bringing part to proper thickness
8. Machine remaining  backside pockets and drill n tap backside holes
Op1
Op2
Op3
Op4
Op5
4.
126651890.002.png 126651890.003.png
Bearing Housing‐2 axis CNC mill
Operation 1 ‐ 30min
1. Cut stock  2.0” long from 2” dia 6061
2. Hold in 3‐jaw chuck
3. Rough red area . RPM=860, F=.010, DOC=.100
4 Finish red area RPM 860 F 005 DOC 005
4. Finish red area. RPM=860, F=.005, DOC=.005
Operation 2 –50 min
1. Hold in 3 jaw chuck
2. Face end to bring part to proper length
3. Drill .75 dia hole to depth shown.
4. Bore large diameter (.8745) first! 
1. Hint: always machine for MMC (maximum material condition = smallest hole or largest diameter). 
2. Hint: Make sure you can accurately bore a smaller dia hole in the part before trying to hit the close tol diameters. For example, try 
boring a hole .8500‐8505 before boring the .8745 hole. If you can make this hole, then you can make the  other 2 with confidence.
5. Bore the small diameter hole. 
6 Machine the red area
6. Machine the red area.
7. Machine the internal groove
8.
Op2
p
Op1
Setup on mill and drill and c’bore the fastener holes.