Side1DecksAssembly.pdf
(
534 KB
)
Pobierz
Side 1 Decks Assembly
Side 1 Decks Assembly
At this point all Sides can be glued to the platform. Note how the edges
of the floor bend downward onto the sides.
Assembly of main Canopy
The red line indicates where the main canopy is placed on Side1. From the
center of Side 1 measure 4 divisions to both sides. That’s the area covered by
the canopy.
These photos are for reference. Note that the beams match every bay division on
Side1.
Assembly of second Canopy
The red line indicates where the second canopy is placed. Photo is for
reference. Note details.
This photo is from prototype model without the details from Side 1. Note the
location of the canopies and their respective beams.
TIP
: It’s better to glue every
canopy or deck without the beams first. Later, the beams can be added. This is to
avoid miscalculations. The photo below shows this technique.
Assembly of left bottom deck
Left bottom deck area designated by the red line.
Front
Back
Every deck has a floor and its railings. Each railing consists of 2 parts, the
front and the back. The photo on the right shows the back portion of the
railing. Each back portion railing lacks the gray area at the bottom. (left arrow)
The floor is glued to the white area precisely at the very bottom of the back
railing.
Plik z chomika:
Prometeusz
Inne pliki z tego folderu:
Side1DecksAssembly.pdf
(534 KB)
MLPboxdetail.pdf
(218 KB)
MLPboxassembly.pdf
(271 KB)
Detailingtheexterioroftheplatform.pdf
(448 KB)
Inne foldery tego chomika:
Banners
General
VARIANTS
Zgłoś jeśli
naruszono regulamin