Outcome_MSC771.pdf

(380 KB) Pobierz
Microsoft Word - Outcome_MSC771.doc
ISPS Code Update
following
The 77 th Session of the Maritime Safety Committee
IMO Headquarters, London
28 th May to 6 th June 2003
Summary of the deliberations of the Maritime Security Working
Group by Angus L McLean, Lloyd’s Register of Shipping
ISPS update following MSC 77 (June 2003)
Page 1 of 8
Marine
1
International Maritime
Organization
Organization
Outcome of the 77 th session of the
th session of the
session of the
Maritime Safety Committee
28 May – 6 June 2003
6 June 2003
© 2003 Lloyd’s Register of Shipping
Marine
3
The Maritime Safety Committee
(MSC) met in London for its 77 th
session between 28 May and 6
June 2003. Maritime Security was
a major topic for discussion and the
Maritime Security Working Group
(MSWG) was convened under the
chairmanship of Mr. Frank Wall of
the UK Department for Transport.
MSWG Report
• 56 Page report to MSC
• (MSC 77/WP.15)
• 21 Recommendations
• All accepted by MSC
© 2003 Lloyd’s Register of Shipping
Marine
2
The MSWG produced a 56-page
report on their deliberations. The
report contained 21
recommendations to the MSC. All
of these recommendations were
accepted.
MSC 77 & the MSWG
• SOLAS Amendments and the ISPS Code can not
be amended before they enter force
• However, Circulars and Resolutions can be made
on “Interpretation and Implementation”
Marine
4
Recommendations
© 2003 Lloyd’s Register of Shipping
• Does not change the text, or intent, of the ISPS
Code
• Major impact on how the Code will be applied
• Indicative of future changes
• Important for all involved in the industry
In keeping with IMO protocol, the
SOLAS amendments and the ISPS
Code, which were adopted at the
Diplomatic Conference in
December 2002, would not be
amended until after they enter into
force in July 2004. MSC would
produce a number of “Circulars”
and “Resolutions” to give guidance
on interpretation and
implementation of the ISPS Code.
© 2003 Lloyd’s Register of Shipping
These recommendations do not
change the text of the ISPS Code
but they do have a major impact on
how the code will be interpreted by
both Flag and Port States. The
recommendations also give an
indication of possible future
amendments to the ISPS Code that
may be made after the Code enters
into force.
ISPS update following MSC 77 (June 2003)
Page 2 of 8
International Maritime
International Maritime
Organization
Outcome of the 77
Outcome of the 77 th
Maritime Safety Committee
28 May
28 May – 6 June 2003
671249966.051.png 671249966.060.png 671249966.061.png 671249966.062.png 671249966.001.png 671249966.002.png 671249966.003.png 671249966.004.png 671249966.005.png 671249966.006.png 671249966.007.png 671249966.008.png 671249966.009.png 671249966.010.png 671249966.011.png 671249966.012.png 671249966.013.png
Marine
5
would have access to the
information only after the ship had
indicated its intention to enter port
and Coastal States could access
information on all ships within 100
miles of their coast. Restricting
information in this way poses a
number of technical problems.
These problems were passed to
the Radio-communication, Search
and Rescue (COMSAR) sub-
committee for resolution. Ships
may turn off LRIT equipment in
similar circumstances to those
when it is permissible to turn off
AIS equipment, but they must
inform their Administration that
LRIT has been disabled.
Long-range identification and tracking
• Some call it “Long Range Targeting”!
• May (will) eventually become SOLAS XI-2 Reg 14
(in 2006?)
• “Worldwide AIS”
• Cost of “Ship Station” borne by Industry
• Other costs borne by Governments
• AIS information is available to all in VHF range
• LRIT information is “secure and confidential”
© 2003 Lloyd’s Register of Shipping
Although not yet in SOLAS XI-2 or
the ISPS Code, Long Range
Identification and Tracking (LRIT)
was discussed by the MSWG. LRIT
can be thought of as a form of “long
range AIS”. Whereas AIS is a VHF
based system whereby safety
related information regarding ship
movements is made available to all
in VHF range, LRIT transmits this
information via satellite and
enables ships to be identified and
tracked anywhere in the world.
Industry groups indicated that the
introduction of LRIT may increase
costs and enable ships to be
“targeted” at long range. MSWG
agreed that LRIT information
should be “secure and confidential”
and that the costs of obtaining LRIT
information should be borne by the
Contracting Government
requesting the information.
Marine
7
FPSO and FSU
• Not subject to the ISPS Code
• Subject to the security
requirements of the country
of location
• Should have security
measures to prevent
“contamination” of visiting
ships.
• Will they?
© 2003 Lloyd’s Register of Shipping
The application of SOLAS XI-2 and
the ISPS Code with regard to
“Floating Production, Storage and
Offloading” (FPSO) facilities,
“Floating Storage Units” (FSU) and
“Single Buoy Moorings” (SBM) was
also discussed. It was agreed that
SOLAS XI-2 would not apply to
such units and that they should be
considered to form part of the
“Offshore Facilities” where they are
located. As such they would be
subject to the security requirements
of the country in which they are
located. Such arrangements
should be sufficient to prevent
visiting ship being “contaminated”
by interfaces which are not covered
by the ISPS Code.
Marine
6
Access to “LRIT” information
• Flag State –Worldwide
• Port State – Once “intention to enter” is received
• Coastal State – Within 100 nautical miles of coast
• LRIT can be turned off by the ship in certain
circumstances
• Flag MUST be informed if such action is taken
© 2003 Lloyd’s Register of Shipping
Access to LRIT information will be
limited as follows: Flag States may
access information on their ships
on a world-wide basis, Port States
ISPS update following MSC 77 (June 2003)
Page 3 of 8
671249966.014.png 671249966.015.png 671249966.016.png 671249966.017.png 671249966.018.png 671249966.019.png 671249966.020.png 671249966.021.png 671249966.022.png 671249966.023.png 671249966.024.png 671249966.025.png 671249966.026.png 671249966.027.png 671249966.028.png 671249966.029.png
Marine
9
Marine
11
ISPS Part B: Mandatory or not ?
Company Audits under the ISPS Code
• Proposal to have “Part B Compliance” marked on
the ISSC not accepted by the MSWG
• Compromise position:
“ISSC would not be issued unless para 8.1 to 13.8
of Part B had been taken into account….”
• Does this, de facto, make Part B mandatory?
• Agreed in principle
• Not before 1 July 2004 !
• A long term aim of IMO
© 2003 Lloyd’s Register of Shipping
© 2003 Lloyd’s Register of Shipping
Between the Diplomatic
Conference in December 2002 and
MSC 77 there has been much
discussion on whether Part B of the
ISPS Code should be considered
“mandatory” or merely “advisory”.
The MSWG agreed that the ISPS
Code places many requirements on
the companies that operate ships
and that it was not possible to
verify compliance with all of these
requirements during a shipboard
verification audit. As such, audits
of the company itself would be
beneficial. Recognizing the short
timeframe for complying with the
ISPS Code it was decided that
company audits would remain a
long-term goal and would not be
made a requirement before July
2004.
It was proposed that International
Ship Security Certificates (ISSC)
should be annotated to indicate
whether Part B of the ISPS Code
had been complied with. This
proposal was not accepted by the
MSWG. Instead it was agreed that
an ISSC would only be issued
when “Paragraphs 8.1 to 13.8 of
Part B had been taken into
account”. The MSWG did not
elaborate on the difference
between “taken into account” and
“complied with”.
Marine
12
The principle of “Non Compliance”
• The major discussion topic of the MSWG
• A proposal would have seen the adoption an
similar approach to ISM
• Not accepted by the MSWG
The International Association of
Classification Societies (IACS) had
raised a number of issues with
regard to implementing the ISPS
Code. The first concerned how
long a Ship Security Plan (SSP)
must be implemented onboard a
ship before compliance with the
Code can be verified. IACS
proposed a minimum of 2 months.
The MSWG did not agree a
minimum time scale as this could
be seen as effectively bringing
forward the entry into force of the
ISPS Code.
© 2003 Lloyd’s Register of Shipping
IACS also raised concerns that
problems may be encountered with
the current pass / fail regime for
verifying compliance with the
requirements of the ISPS Code.
As the ISPS Code is largely
management systems based, there
may be circumstances when a “non
conformity” that would preclude the
issue of an ISSC could not be
cleared unless the ship is allowed
to continue trading. In the plenary
session, many members were
ISPS update following MSC 77 (June 2003)
Page 4 of 8
671249966.030.png 671249966.031.png 671249966.032.png 671249966.033.png 671249966.034.png 671249966.035.png 671249966.036.png 671249966.037.png 671249966.038.png 671249966.039.png 671249966.040.png 671249966.041.png 671249966.042.png 671249966.043.png 671249966.044.png 671249966.045.png 671249966.046.png
adamant that only “full compliance”
would be acceptable where
security was concerned. To accept
any form of non compliance may
be seen as being “soft on security”
and may therefore be unacceptable
to their governments.
and an action plan agreed. The
action plan is to detail how the
“failure” will be corrected, the time
scale for correction and any
alternative security measures that
will be put in place until the “failure”
is corrected. If the agreed action
plan is not followed or alternative
arrangements are not put in place,
the Administration may withdraw
the ISSC.
Marine
13
“Non Compliance”
• We do not have “non compliance” we have
“failures” or “deviations”
• We have “failures” which DO NOT effect the ships
ability to operate at Security Levels 1 – 3
• We have “major failures” which DO effect the
ships ability to operate at Security Levels 1 – 3
• Issue of the ISSC is a special case ….
Marine
20
The certification process
• Is it an audit similar to ISM ?
• Is it an inspection similar to Safety Equipment?
• Hardware requirements: 100 % Inspection at
every “verification”.
• Procedural requirements will be subject to an
audit based on “representative samples”
© 2003 Lloyd’s Register of Shipping
As the terms “non conformance”
and “non compliance” were
deemed unacceptable, the terms
“failure” and “deviation” were
introduced to describe a “failure to
meet a specified requirement”.
These failures were further
classified into those that do not
affect the ships ability to operate at
security levels and those that do . It
was also agreed that all ISSCs
must be issued “clean”. No
“failure” can be present when an
ISSC is issued, regardless of
whether the failure(s) affect the
ships ability to operate at security
levels or not.
© 2003 Lloyd’s Register of Shipping
Discussions were held on how the
verification process should be
carried out. Operational, or
procedural, aspects will be subject
to audit using a representative
sampling process in a similar
manner to ISM. Any “security
equipment” will be subject to a
100% inspection at each
verification. “Security equipment”
is any equipment that is mentioned
in the Ship Security Plan (SSP) that
has a security function. This
equipment will include any “dual
use” equipment such as deck
lighting that is used for normal ship
operations in addition to its role for
security.
Marine
16
“Failures” at other times
• “Major Failure”: Reported immediately to
Administration (or RSO) and Port State, along
with remedial “action plan”. Additional
verification will be required.
• “Minor Failures”: Reported without delay to
Administration (or RSO) with action plan for
corrective action. Additional verification may be
required.
© 2003 Lloyd’s Register of Shipping
“Failures” at other times must be
reported to the Administration (or
Recognised Security Organization)
ISPS update following MSC 77 (June 2003)
Page 5 of 8
671249966.047.png 671249966.048.png 671249966.049.png 671249966.050.png 671249966.052.png 671249966.053.png 671249966.054.png 671249966.055.png 671249966.056.png 671249966.057.png 671249966.058.png 671249966.059.png
Zgłoś jeśli naruszono regulamin